CDS CD23(1) – Reconnecting Bank & Cherry
PLEASE TAKE NOTICE that—pursuant to 19 V.S.A. Chapter 7 —the City of Burlington plans to hold a public hearing to consider condemning certain parcels of land for the purpose of reconstruction of Cherry Street, and, if so, to determine the damages sustained by those owning or interested in the parcels. Based on municipal records, such parcels are located in Burlington, Vermont at 20 Pine Street, 101 Cherry Street, and 29 Church Street. Pursuant to such condemnation, the City of Burlington will consider whether it is necessary for public use and benefit to take the subject parcels on both a temporary and permanent basis for use in alteration and reconstruction of the intersections. Such temporary basis will last until a project completion date of November 1, 2030, but may be extended depending on project needs. The permanent basis will be needed to accommodate one stormwater catch basin at the existing curb on Saint Paul Street. The necessity and compensation due to those owning or interested in such property for such condemnation will be addressed at the hearings held at a meeting of Burlington City Council, Mayor Presiding, on Monday, June 22, 2026 at 6 p.m. EDT, located at 149 Church Street, Burlington, Vermont. There will be a site visit beginning at 5 p.m. EDT on Monday, June 22, 2026 starting at the intersection of Cherry Street and Saint Paul Street. No testimony will be taken at the site visit. Testimony will be accepted at the hearing from interested parties. Meeting information and instructions for remote participation are posted here once the agenda is published: https://burlingtonvt.portal.civicclerk.com/

